I-94 / TH 280 Managed Lanes Study Phase II

Project manager for the second phase of conceptualization, evaluation, and development of MnPASS managed lanes on the I-94 corridor between downtown Minneapolis and downtown St. Paul.  Phase 2 concentrated upon the conceptual design and evaluation of direct connections between median managed lanes and the two downtown centers, as well as the provision of managed lanes through the highly constrained I-94 / TH-280 interchange.  Activities included preliminary design, travel demand forecasting, micro-simulation of traffic metrics, and public attitudes assessment.